Mark heights and keep the doorway clear
Section width x=0…6, length z=0…11. Additional height above a level base: 0,0,1,1,2,2,3. The entrance of the house is located at the top lane x=6; add the actual height of the base to these local values.
Place temporary posts at the door, low ground and water. Check lower windows and exterior mechanisms before backfilling. If the original area contains a hole, its volume is added separately: the table describes a flat base.
Fill the main volume
Sum of heights 9; each stripe lasts 12 blocks, so backfilling requires 9×12=108 blocks. Take two stacks of lands with a supply of 20. Lay out three strips of steps across a short passage: nine steps for a three-block path if the route crosses all three climbs.
Walk around the slope without grass and bushes. The top surface should reach the door landing, and not cover the opening itself. On shore, check the current separately after removing the temporary blocks.
Add detail around the tested path
Move the edge of one terrace forward a block, the other back. Leave the central route the same: the random height of each square will make the walk jumpy. A retaining wall, if required, must be connected to the ground at both ends.
Place wood, stones and grass after the walking test in both directions. Leave the door and the edge of the stairs visible; for a boat approach, check not only the picture of the shore, but also the actual passage.
The width and height of the route should continue to the deck. Connect the approach to the crossing.
The crown and roots do not occupy the already proven path. Add a tree with a known size.

